Woods Hole Oceanographic Institution
Cruise Planning Synopsis
OC474 | |
Ship | |
R/V Oceanus | |
Cruise Party | |
Roger Gauss: Principal Investigator NRL USA +1 240 593 6187 roger.gauss@nrl.navy.mil Richard Menis: Principal Investigator Naval Research Laboratory 4555 Overlook Ave. SW Washington, DC USA 20375 +1 202 404 4810 richard.menis@nrl.navy.mil Tim Stanton: Chief Scientist Woods Hole Oceanographic Institution Bigelow 201-C, MS#11 Woods Hole, Ma. USA 02543 +1 508 289 2757 tstanton@whoi.edu | |
- added Tim Stanton as Chief Scientist on Jul 1, 2011 11:50 AM by Chad Smith | |
- added Roger Gauss as Principal Investigator on Jul 1, 2011 11:50 AM by Chad Smith | |
- added Richard Menis as Principal Investigator on Jul 1, 2011 11:50 AM by Chad Smith |
Departure: Sep 6, 2011 | |
WHOI | |
Arrival: Sep 17, 2011 | |
WHOI | |
Operations Area | |
Northern Flank of Georges Bank | |
- Northern Flank of Georges Bank on Jul 1, 2011 11:50 AM by Chad Smith | |
Lat/Lon: 41° 0.0′ N / 66° 0.0′ W | |
- set lat to 41° 0.0′ N, set lon to 66° 0.0′ W on Jul 1, 2011 11:50 AM by Chad Smith | |
Depth Range: 50. m / 350. m | |
- set min to 50. m, set max to 350. m on Jul 1, 2011 11:50 AM by Chad Smith | |
Will the vessel be operating within 200 NM of a foreign country? | Yes, Canadian Waters/Hague Line (>10nm from Hague Line) |
- Yes, Canadian Waters/Hague Line (>10nm from Hague Line) on Jul 1, 2011 11:50 AM by Chad Smith | |
Are visas or special travel documents required? | no |
- set to no on Jul 1, 2011 11:50 AM by Chad Smith | |
Science Objectives | |
Conduct acoustic and net surveys over and near Georges Bank. Advanced broadband acoustic systems will be used to classify swimbladder-bearing fish through their resonance. The studies will involve transects and measurements at fixed locations. | |
- Conduct acoustic and net surveys over and near Georges Bank. Advanced broadband acoustic systems will be used to classify swimbladder-bearing fish through their resonance. The studies will involve transects and measurements at fixed locations. on Jul 1, 2011 11:50 AM by Chad Smith | |
Science Activities | |
Deploy EdgeTech sonar and NRL source and receiver systems over Georges Bank studying the fish in conjunction with FR/V DELAWARE II. Ship's personnel required for deployment and recovery of instrumentation: Bo'sun and 1 to 2 seamen. | |
- Deploy EdgeTech sonar and NRL source and receiver systems over Georges Bank studying the fish in conjunction with FR/V DELAWARE II. Ship's personnel required for deployment and recovery of instrumentation: Bo'sun and 1 to 2 seamen. on Jul 1, 2011 11:50 AM by Chad Smith | |
Additional Info | |
Pre-cruise Planning Meeting: Teleconference/Visit WHOI | |
- Teleconference/Visit WHOI on Jul 1, 2011 11:50 AM by Chad Smith | |
Meeting Notes: Stanton is at WHOI and can participate in person, Gauss is at NRL and will participate by telecon | |
- Stanton is at WHOI and can participate in person, Gauss is at NRL and will participate by telecon on Jul 1, 2011 11:50 AM by Chad Smith | |
Stations: | |
Supporting documentation: | |
»MFASourceStructuralAnalysis.pdf | |
»Revised_Tow_Cable_Specs.pdf | |
»NRLWinch001.pdf | |
»NRL_Sonar_July2011.pptx | |
»More_NRL_MF_SourceArray_Winch_Pictures.ppt | |
»MFA_Source_Photos_2008.ppt | |
- added MFASourceStructuralAnalysis.pdf on Aug 26, 2011 9:32 AM by Chad Smith | |
- added Revised_Tow_Cable_Specs.pdf on Aug 26, 2011 9:32 AM by Chad Smith | |
- added NRLWinch001.pdf on Aug 19, 2011 12:52 PM by Chad Smith | |
- added NRL_Sonar_July2011.pptx on Aug 19, 2011 12:52 PM by Chad Smith | |
- added More_NRL_MF_SourceArray_Winch_Pictures.ppt on Aug 19, 2011 12:52 PM by Chad Smith | |
- added MFA_Source_Photos_2008.ppt on Aug 19, 2011 12:52 PM by Chad Smith |
Funding |
Funding Agency: ONR/NAVY | |
Grant or contract number: N00014-11-WX-20055 |
Scientific Instrumentation for R/V Oceanus |
Shipboard Equipment | |||||||||||
ADCP 150 kHz, | |||||||||||
ADCP 75 kHz, | |||||||||||
Bathymetry System 12 kHz, | |||||||||||
Sippican XBT System (Mark 21) | |||||||||||
-added ADCP 150 kHz on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
-added ADCP 75 kHz on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
-added Bathymetry System 12 kHz on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
-added Sippican XBT System (Mark 21) on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
Shipboard Communication | |||||||||||
Basic Internet access via HiSeasNet | |||||||||||
-added Basic Internet access via HiSeasNet on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
CTD/Water Sampling | |||||||||||
911+ Rosette 24-position, 10-liter bottle Rosette with dual T/C sensors, | |||||||||||
Wet Labs ECO-AFL fluorometer | |||||||||||
-added 911+ Rosette 24-position, 10-liter bottle Rosette with dual T/C sensors on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
-added Wet Labs ECO-AFL fluorometer on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
Critical CTD Sensors | |||||||||||
Sound Velocity profile no water water sapmles required | |||||||||||
- added Sound Velocity profile no water water sapmles required on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
CTD-Related Equipment | |||||||||||
ECO/AFL and STM sensor (WHOI owned) | |||||||||||
-added ECO/AFL and STM sensor on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
MET Sensors | |||||||||||
Air temperature, | |||||||||||
Barometric Pressure, | |||||||||||
Precipitation, | |||||||||||
Relative Humidity, | |||||||||||
Wind speed and direction | |||||||||||
-added Air temperature on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
-added Barometric Pressure on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
-added Precipitation on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
-added Relative Humidity on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
-added Wind speed and direction on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
Storage Notes: | |||||||||||
Navigation | |||||||||||
Will you be using Long Base Line (LBL) navigation? | no | ||||||||||
- added no on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
How many nets? | null | ||||||||||
How many tansponders? | null | ||||||||||
Will you be using Doppler/GPS navigation? | no | ||||||||||
- added no on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
Navigation | |||||||||||
GPS | |||||||||||
-added GPS on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
Navigation Notes:
Reguire the most accurate position information available on ship. Is that your Doppler/GPS system? Selecting Doppler/GPS not available as selection choice in questionaire. Box: 41.0N-43.75N and 66.0-76.75W | |||||||||||
- changed from Box: 41.0N-43.75N and 66.0-76.75W | |||||||||||
- changed from Box: 41.0N-43.75N and 66.0-76.75W on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
- added Box: 41.0N-43.75N and 66.0-76.75W on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
Winches | |||||||||||
CTD Winch with .322" Electro-mechanical wire, | |||||||||||
Other Portable Winch | |||||||||||
-added CTD Winch with .322" Electro-mechanical wire on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
-added Other Portable Winch on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
Winch Notes:
Stanton group will be bringing a winch either from URI's scanfish system or a WHOI 'winch pool' winch with a wire for towing WHOI EdgeTech system off the stern Aframe. NRL winch 8 ft. x 8ft. x 8ft. 10000 lbs. - main deck 'ScanFish' (or other) winch 5 ft. x 5 ft. x 4 ft. 2500 lbs. 01 level (01 is where WHOI put it on Endeavor) | |||||||||||
- added Stanton group will be bringing a winch either from URI's scanfish system or a WHOI 'winch pool' winch with a wire for towing WHOI EdgeTech system off the stern Aframe. NRL winch 8 ft. x 8ft. x 8ft. 10000 lbs. - main deck 'ScanFish' (or other) winch 5 ft. x 5 ft. x 4 ft. 2500 lbs. 01 level (01 is where WHOI put it on Endeavor) on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
Wire use and application | |||||||||||
CTD Winch with .322" Electro-mechanical wire | |||||||||||
-added CTD Winch with .322" Electro-mechanical wire on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
Wires Notes: Gauss group uses CTD wire (as strength member and for telemetry data) off the starboard side for towing receiver array | |||||||||||
- added Gauss group uses CTD wire (as strength member and for telemetry data) off the starboard side for towing receiver array on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
Standard Oceanographic Cables | |||||||||||
| |||||||||||
Specialized Deck Equipment | |||||||||||
| |||||||||||
Cruise Specific Science Winch Revisions - Cruise Specific Science Winch Required? : changed from - Cruise Specific Science Winch Required? : changed from - Cruise Specific Science Winch Required? : added no on Jul 1, 2011 11:50 AM by Chad Smith - Type : added see notes on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
Over the Side Equipment | |||||||||||
Will you be bringing any equipment (winches, blocks, etc.) that lowers instruments over the side? | yes | ||||||||||
Details: Two systems being used in sequence; NRL system and WHOI Edgetech system. On Endeavor Edgetech system has been moved to port rail using a pallet jack during NRL system operations. WHOI Edgetech is deployed using scanfish winch on 01 deck through A-frame
NRL system is a two wire deployment; source through center of A-Frame using NRL supplied block and NRL winch on main deck and the receiver array deployed/retrieved from starboard J-frame using CTD wire as strength member while underway(avoids interference with prop). Three Air tuggers available to assist in deploying/recovery of source, which includes chain weight.
Deck space needs: NRL source and deployment box 14 ft. x 2ft. x 2 ft. 1800 lbs - main deck NRL Winch 8 ft x 8 ft x 8 ft @ 10000lbs – main deck NRL receiver umbilical cable deployment box 6.5 ft x 4 ft x 3 ft | |||||||||||
Special Requirements | |||||||||||
| |||||||||||
Electrical Power Revisions - Electrical Power : changed from - Electrical Power : changed from - Electrical Power : added no on Jul 1, 2011 11:50 AM by Chad Smith - Identify : added 480V 3 phase 30 Amp for NRL winch main deck; 480V 3 phase 30&60 Amp circuits for two Power Amplifie on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
Inter/intraship Communications Revisions - Inter/intraship Communications : changed from - Inter/intraship Communications : changed from - Inter/intraship Communications : added no on Jul 1, 2011 11:50 AM by Chad Smith - Identify : added Radio communication for marine mammal observers and ship communication to NOAA ship Delaware on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
Additional Cruise Items/Activities | |||||||||||
Explosive Devices: | no | ||||||||||
Portable Air Compressors: | no | ||||||||||
Flammable Gases: | no | ||||||||||
Small Boat Operations: | no | ||||||||||
SCUBA Diving Operations: | no | ||||||||||
Hazardous Material | |||||||||||
Will hazardous material be utilized? | yes | ||||||||||
- added yes on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
Describe deployment method and quantity: Receiver array is filled with ISOPAR-M oil (~20 gallons). | |||||||||||
- added Receiver array is filled with ISOPAR-M oil (~20 gallons). on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
Radioactive Material | |||||||||||
Radioiosotopes: | no | ||||||||||
Additional Information | |||||||||||
Is night time work anticipated on this cruise? | yes | ||||||||||
- added yes on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
Specialized tech support (Seabeam, coring, other): Is night time work anticipated on this cruise? yes Specialized tech support (Seabeam, coring, other): The two groups generally split the day in two with each group working roughly 9AM-9PM or 9PM-9AM. Nighttime ops usually begin after dinnertime and run continuously until just after breakfast. Daytime ops may involve more deployments and recoveries than just once per day. Need XBT launcher and computer, NRL will provide XBTs Other required equipment and special needs: Mobilization begins Sept 2 and continues through Labor Day weekend Source system was used extensively on R/V Oceanus during a 2007 cruise. John Dyke was our POC for that cruise. | |||||||||||
- added Is night time work anticipated on this cruise? yes Specialized tech support (Seabeam, coring, other): The two groups generally split the day in two with each group working roughly 9AM-9PM or 9PM-9AM. Nighttime ops usually begin after dinnertime and run continuously until just after breakfast. Daytime ops may involve more deployments and recoveries than just once per day. Need XBT launcher and computer, NRL will provide XBTs Other required equipment and special needs: Mobilization begins Sept 2 and continues through Labor Day weekend Source system was used extensively on R/V Oceanus during a 2007 cruise. John Dyke was our POC for that cruise. on Jul 1, 2011 11:50 AM by Chad Smith | |||||||||||
Other required equipment and special needs: Up to three air tuggers need to be available for NRL deployment and recovery of NRL systems. | |||||||||||
- added Up to three air tuggers need to be available for NRL deployment and recovery of NRL systems. on Jul 1, 2011 11:50 AM by Chad Smith |
Checklist & Notes |
Checklist | |
U.S. Customs Form: | no |
Diplomatic Clearance: | no |
Date Submitted: | |
Date Approved: | |
Agent Information: | |
Countries: | |
Notes: | |
Isotope Use Approval: | no |
Isotope Notes: | |
SCUBA Diving: | no |
Checklist | |
SSSG Tech: | |