Woods Hole Oceanographic Institution
Cruise Planning Synopsis
AT26-20 | |
Ship | |
R/V Atlantis | |
Cruise Party | |
C. David Chadwell: Chief Scientist, Principal Investigator University of California San Diego La Jolla, CA United States 92093-0205 +1 858 534 2663 cchadwell@ucsd.edu | |
- added C. David Chadwell as Chief Scientist on Apr 15, 2014 1:44 PM by Eric Benway | |
- added C. David Chadwell as Principal Investigator on Apr 15, 2014 1:44 PM by Eric Benway |
Departure: Sep 15, 2014 | |
Astoria | |
Arrival: Sep 20, 2014 | |
Astoria | |
Operations Area | |
Offshore Washington State, Offshore Newport Oregon | |
- Offshore Washington State, Offshore Newport Oregon on Apr 15, 2014 1:44 PM by Eric Benway | |
Lat/Lon: 45° 0.0′ N / 125° 0.0′ W | |
- set lat to 45° 0.0′ N, set lon to 125° 0.0′ W on Apr 15, 2014 1:44 PM by Eric Benway | |
Depth Range: 1000 / 3000 | |
- set min to 1000, set max to 3000 on Apr 15, 2014 1:44 PM by Eric Benway | |
Will the vessel be operating within 200 NM of a foreign country? | No, south of Canadian EEZ. |
- No, south of Canadian EEZ. on Apr 15, 2014 1:44 PM by Eric Benway | |
Are visas or special travel documents required? | no |
- set to no on Apr 15, 2014 1:44 PM by Eric Benway | |
Science Objectives | |
The purpose of this proposal is to initiate seafloor geodetic measurements of plate | |
- The purpose of this proposal is to initiate seafloor geodetic measurements of plate | |
Science Activities | |
Purpose of cruise is to deploy a total of eight free-fall packages with four units deployed offshore the coast of Washington State nominally at 46-30N, 126-28W and and four units deployed offshore Newport Oregon at nominally 44-40N, 125-10W. Each package consists of Sonardyne Fetch transponder on a concrete benchmark and an float package that can be released by acoustic command from the surface. Packages are released at the sea surface and free fall to the sea floor. While on station deploy Wave Glider for data collection, then recover. | |
- Purpose of cruise is to deploy a total of eight free-fall packages with four units deployed offshore the coast of Washington State nominally at 46-30N, 126-28W and and four units deployed offshore Newport Oregon at nominally 44-40N, 125-10W. Each package consists of Sonardyne Fetch transponder on a concrete benchmark and an float package that can be released by acoustic command from the surface. Packages are released at the sea surface and free fall to the sea floor. While on station deploy Wave Glider for data collection, then recover. on Apr 15, 2014 1:44 PM by Eric Benway | |
Additional Info | |
Pre-cruise Planning Meeting: Teleconference | |
- Teleconference on Apr 15, 2014 1:44 PM by Eric Benway | |
- on Apr 15, 2014 1:44 PM by Eric Benway | |
Stations: | |
STATION 1 Distance: null Days: 2 Latitude: 46° 30.0 N Longitude: 126° 28.0 W Station 2 Distance: null Days: 2 Latitude: 44° 40.0 N Longitude: 125° 10.0 W | |
- added Name: STATION 1, Lat: 46° 30.0 N, Lon: 126° 28.0 W, Distance: , Days: 2 added Name: Station 2, Lat: 44° 40.0 N, Lon: 125° 10.0 W, Distance: , Days: 2 on Apr 15, 2014 1:44 PM by Eric Benway | |
Supporting documentation: | |
»chadwell_deck_plan.pdf | |
»July_25_chadwell_launch_package.pdf | |
- added chadwell_deck_plan.pdf on Aug 6, 2014 4:06 PM by Eric Benway | |
- added July_25_chadwell_launch_package.pdf on Aug 6, 2014 4:06 PM by Eric Benway | |
- | |
- added 032514-01DP.pdf on Apr 15, 2014 1:44 PM by Eric Benway | |
Notes: The 8 bottom sensor packaages will be deployed and set on the bottom. Once that is completed Half of the package will be released and will float to surface for recovery. Ships crane will do both deployement and recovery. See "July 25 Chadwell launch pacakage" diagram attachment. | |
- -changed The 8 bottom sensor packaages will be deployed and set on the bottom. Once that is completed Half of the package will be released and will float to surface for recovery. Ships crane will do both deployement and recovery. to The 8 bottom sensor packaages will be deployed and set on the bottom. Once that is completed Half of the package will be released and will float to surface for recovery. Ships crane will do both deployement and recovery. See "July 25 Chadwell launch pacakage" diagram attachment. on Sep 15, 2014 9:04 AM by Eric Benway | |
- -added The 8 bottom sensor packaages will be deployed and set on the bottom. Once that is completed Half of the package will be released and will float to surface for recovery. Ships crane will do both deployement and recovery. on Sep 15, 2014 9:04 AM by Eric Benway |
Funding |
Funding Agency: NSF | |
Grant or contract number: OCE-1249876 |
Scientific Instrumentation for R/V Atlantis |
Shipboard Equipment | |||||||||||
Bathymetry System 12 kHz, | |||||||||||
Bathymetry System 3.5 kHz , | |||||||||||
Transponder Navigation - Sonardyne USBL, | |||||||||||
Navigation - Heading, | |||||||||||
Multibeam , | |||||||||||
Navigation - Position | |||||||||||
-added Bathymetry System 12 kHz on Apr 15, 2014 1:44 PM by Eric Benway | |||||||||||
-added Bathymetry System 3.5 kHz on Apr 15, 2014 1:44 PM by Eric Benway | |||||||||||
-added Multibeam on Apr 15, 2014 1:44 PM by Eric Benway | |||||||||||
-added Navigation - Heading on Apr 15, 2014 1:44 PM by Eric Benway | |||||||||||
-added Navigation - Position on Apr 15, 2014 1:44 PM by Eric Benway | |||||||||||
-added Transponder Navigation - Sonardyne USBL on Apr 15, 2014 1:44 PM by Eric Benway | |||||||||||
Shipboard Communication | |||||||||||
Basic Internet access via HiSeasNet, | |||||||||||
Is there a need to receive data from shore on a regular basis?, | |||||||||||
Is there a need to transfer data to shore on a regular basis? | |||||||||||
-added Basic Internet access via HiSeasNet on Apr 15, 2014 1:44 PM by Eric Benway | |||||||||||
-added Is there a need to receive data from shore on a regular basis? on Apr 15, 2014 1:44 PM by Eric Benway | |||||||||||
-added Is there a need to transfer data to shore on a regular basis? on Apr 15, 2014 1:44 PM by Eric Benway | |||||||||||
CTD/Water Sampling | |||||||||||
911+ Rosette 24-position, 10-liter bottle Rosette with dual T/C sensors | |||||||||||
-added 911+ Rosette 24-position, 10-liter bottle Rosette with dual T/C sensors on Apr 15, 2014 1:44 PM by Eric Benway | |||||||||||
Critical CTD Sensors | |||||||||||
Storage Notes: | |||||||||||
Navigation | |||||||||||
Will you be using Long Base Line (LBL) navigation? | no | ||||||||||
- added no on Apr 15, 2014 1:44 PM by Eric Benway | |||||||||||
How many nets? | null | ||||||||||
How many tansponders? | null | ||||||||||
Will you be using Ultra-short baseline (USBL) navigation? | no | ||||||||||
- added no on Apr 15, 2014 1:44 PM by Eric Benway | |||||||||||
Navigation | |||||||||||
GPS, | |||||||||||
LBL, | |||||||||||
USBL | |||||||||||
-added GPS on Apr 15, 2014 1:44 PM by Eric Benway | |||||||||||
-added LBL on Apr 15, 2014 1:44 PM by Eric Benway | |||||||||||
-added USBL on Apr 15, 2014 1:44 PM by Eric Benway | |||||||||||
Navigation Notes: Dynamic positioning required during deployments. Use Altlantis Sonardyne system to talk to our Sonardyne Fetch units to determine status on sea floor. | |||||||||||
- added Dynamic positioning required during deployments. Use Altlantis Sonardyne system to talk to our Sonardyne Fetch units to determine status on sea floor. on Apr 15, 2014 1:44 PM by Eric Benway | |||||||||||
Winches | |||||||||||
CTD Winch with .322" Electro-mechanical wire | |||||||||||
-added CTD Winch with .322" Electro-mechanical wire on Apr 15, 2014 1:44 PM by Eric Benway | |||||||||||
Winch Notes: TBD for launch of packages and launch/recovery of Wave Glider. | |||||||||||
- added TBD for launch of packages and launch/recovery of Wave Glider. on Apr 15, 2014 1:44 PM by Eric Benway | |||||||||||
Winch Notes: TBD for launch of packages and launch/recovery of Wave Glider. | |||||||||||
- added TBD for launch of packages and launch/recovery of Wave Glider. on Apr 15, 2014 1:44 PM by Eric Benway | |||||||||||
Standard Oceanographic Cables | |||||||||||
| |||||||||||
Specialized Deck Equipment | |||||||||||
| |||||||||||
Over the Side Equipment | |||||||||||
Will you be bringing any equipment (winches, blocks, etc.) that lowers instruments over the side? | yes | ||||||||||
Details: TBD for launch of packages and launch/recovery of Wave Glider. | |||||||||||
- added TBD for launch of packages and launch/recovery of Wave Glider. on Apr 15, 2014 1:44 PM by Eric Benway | |||||||||||
Special Requirements | |||||||||||
| |||||||||||
Additional Cruise Items/Activities | |||||||||||
Explosive Devices: | no | ||||||||||
Portable Air Compressors: | no | ||||||||||
Flammable Gases: | no | ||||||||||
Small Boat Operations: | yes | ||||||||||
SCUBA Diving Operations: | no | ||||||||||
Hazardous Material | |||||||||||
Will hazardous material be utilized? | yes | ||||||||||
- added yes on Apr 15, 2014 1:44 PM by Eric Benway | |||||||||||
Describe deployment method and quantity: Lithium batteries. | |||||||||||
- added Lithium batteries. on Apr 15, 2014 1:44 PM by Eric Benway | |||||||||||
Radioactive Material | |||||||||||
Radioiosotopes: | no | ||||||||||
Additional Information | |||||||||||
Is night time work anticipated on this cruise? | yes | ||||||||||
- added yes on Apr 15, 2014 1:44 PM by Eric Benway | |||||||||||
Specialized tech support (Seabeam, coring, other): TBD for launch of packages and launch/recovery of Wave Glider. | |||||||||||
- added TBD for launch of packages and launch/recovery of Wave Glider. on Apr 15, 2014 1:44 PM by Eric Benway | |||||||||||
Other required equipment and special needs: |
Checklist & Notes |
Checklist | |
U.S. Customs Form: | no |
- added no on May 23, 2014 10:54 AM by Eric Benway | |
Diplomatic Clearance: | no |
- added no on May 23, 2014 10:54 AM by Eric Benway | |
Date Submitted: | |
Date Approved: | |
Agent Information: | |
United States (Astoria, OR)Master R/V ATLANTIS Esther Jones, Administrative Assistant Port of Astoria Direct Line: (503) 741-3300 | |
- changed from United States (Astoria, OR)Master R/V ATLANTIS Esther Jones, Administrative Assistant Port of Astoria Direct Line: (503) 741-3300 Master R/V ATLANTIS Herb Florer, Director, Seaports Division Esther Jones, Administrative Assistant Port of Astoria Tel: (503) 741-3300 | |
- added United States (Astoria, OR)Master R/V ATLANTIS Esther Jones, Administrative Assistant Port of Astoria Direct Line: (503) 741-3300 | |
Countries: | |
USA | |
- added USA on May 23, 2014 10:54 AM by Eric Benway | |
Notes: | |
None req. | |
- added None req. on May 23, 2014 10:54 AM by Eric Benway | |
Isotope Use Approval: | no |
- added no on May 23, 2014 10:54 AM by Eric Benway | |
Isotope Notes: | |
none | |
- added none on May 23, 2014 10:54 AM by Eric Benway | |
SCUBA Diving: | no |
- added no on May 23, 2014 10:54 AM by Eric Benway | |
Checklist | |
SSSG Tech: | |
Dave Simms and Ellen Roosen | |
- added Dave Simms and Ellen Roosen on May 23, 2014 10:54 AM by Eric Benway | |
Mobe in Astoria Sept 13 & 14 Demobe Astoria Sept 21. | |
- removed answer Demobe Astoria Sept 21. | |
- added Mobe in Astoria Sept 13 & 14 Demobe Astoria Sept 21. on May 23, 2014 10:54 AM by Eric Benway | |