Woods Hole Oceanographic Institution

Cruise Planning Synopsis


AR18 Plueddemann "OOI Pioneer 8"

Ship

RV Neil Armstrong

Cruise Party

Paul Matthias: Principal Investigator
Woods Hole Oceanographic Institution LOSOS 213, MS#57 Woods Hole, Ma. USA 02543
+1 508 289 3672
pmatthias@whoi.edu

Albert Plueddemann: Chief Scientist
Woods Hole Oceanographic Institution Clark 202A, MS#29 Woods Hole, Ma. USA 02543
+1 508 289 2789
aplueddemann@whoi.edu
- added Albert Plueddemann as Chief Scientist on Mar 14, 2017 3:15 PM by Chad Smith
- added Paul Matthias as Principal Investigator on Mar 14, 2017 3:15 PM by Chad Smith

Departure: May 30, 2017

Woods Hole

Arrival: Jun 20, 2017

Woods HOle

Operations Area

Continental shelf and slope south of New England
- Continental shelf and slope south of New England on Mar 14, 2017 3:15 PM by Chad Smith
Lat/Lon: 40° 0.0′ N / 71° 0.0′ W
- set lat to 40° 0.0′ N, set lon to 71° 0.0′ W on Mar 14, 2017 3:15 PM by Chad Smith
Depth Range: 60 / 600
- set min to 60, set max to 600 on Mar 14, 2017 3:15 PM by Chad Smith
Will the vessel be operating within 200 NM of a foreign country? N/A
- N/A on Mar 14, 2017 3:15 PM by Chad Smith
Are visas or special travel documents required? no
- set to no on Mar 14, 2017 3:15 PM by Chad Smith

Science Objectives

This is the eighth major infrastructure deployment and servicing cruise for the Pioneer Array of the National Science Foundation’s Ocean Observatories Initiative (OOI). The Pioneer Array includes a network of moorings and autonomous robotic vehicles to monitor waters of the continental shelf and slope south of New England and, in particular, the shelfbreak front where nutrients and other properties are exchanged between the coast and the deep ocean. Data from the Pioneer Array will provide new insights into coastal ocean processes such as shelf/slope nutrient exchange, air-sea property exchange, carbon cycling, and ocean acidification that are important to the New England shelf, and to continental shelf ecosystems around the world. For further information, see http://www.oceanobservatories.org.
- This is the eighth major infrastructure deployment and servicing cruise for the Pioneer Array of the National Science Foundation’s Ocean Observatories Initiative (OOI). The Pioneer Array includes a network of moorings and autonomous robotic vehicles to monitor waters of the continental shelf and slope south of New England and, in particular, the shelfbreak front where nutrients and other properties are exchanged between the coast and the deep ocean. Data from the Pioneer Array will provide new insights into coastal ocean processes such as shelf/slope nutrient exchange, air-sea property exchange, carbon cycling, and ocean acidification that are important to the New England shelf, and to continental shelf ecosystems around the world. For further information, see http://www.oceanobservatories.org. on Mar 14, 2017 3:15 PM by Chad Smith

Science Activities

The Pioneer-8 cruise will consist of 3 separate legs with distinct objectives. Leg A will focus on ROV operations. The main objectives are to recover 1 surface mooring anchor module and 4 profiler mooring anchors. The main objectives of Leg B are to deploy and recover 3 Coastal Surface Moorings (CSMs), deploy up to 8 and recover up to 6 Coastal Pioneer (CP) Gliders, and deploy 2 AUVs (singly or simultaneously) for ship-attended missions. The main objectives of Leg C are to deploy and recover 5 Coastal Profiler Moorings (CPMs). All three legs will involve ancillary activities, including CTD casts with water sampling adjacent to moorings, gliders and AUVs, comparison of buoy and shipboard data, cross-shelf CTD surveys in the vicinity of the moored array, and surveys using shipboard sensors (ADCP, EK-80, thermosalinograph, multibeam) in the Pioneer moored array region.
- The Pioneer-8 cruise will consist of 3 separate legs with distinct objectives. Leg A will focus on ROV operations. The main objectives are to recover 1 surface mooring anchor module and 4 profiler mooring anchors. The main objectives of Leg B are to deploy and recover 3 Coastal Surface Moorings (CSMs), deploy up to 8 and recover up to 6 Coastal Pioneer (CP) Gliders, and deploy 2 AUVs (singly or simultaneously) for ship-attended missions. The main objectives of Leg C are to deploy and recover 5 Coastal Profiler Moorings (CPMs). All three legs will involve ancillary activities, including CTD casts with water sampling adjacent to moorings, gliders and AUVs, comparison of buoy and shipboard data, cross-shelf CTD surveys in the vicinity of the moored array, and surveys using shipboard sensors (ADCP, EK-80, thermosalinograph, multibeam) in the Pioneer moored array region. on Mar 14, 2017 3:15 PM by Chad Smith

Additional Info

Pre-cruise Planning Meeting: Visit WHOI
- Visit WHOI on Mar 14, 2017 3:15 PM by Chad Smith
- on Mar 14, 2017 3:15 PM by Chad Smith

Stations:

Supporting documentation:

»CGSN_Pioneer-8_IRR_schedule.activities_May_23.pdf
»CGSN_Pioneer-8_IRR_Leg_3_Deck_plan.pdf
»CGSN_Pioneer-8_IRR_Leg_2_Deck_plan.pdf
»CGSN_Pioneer-8_IRR_Leg_1_Deck_plan.pdf
»Pioneer8_timeline_v3.docx
»Pioneer_CTD_HAZMAT_list_with_MSDS.pdf
»Surface_Buoy_Recovery_Procedure_with_MSDS.pdf
»Pioneer8_waypoints.xls
- added CGSN_Pioneer-8_IRR_schedule.activities_May_23.pdf on May 23, 2017 10:47 AM by Elizabeth A. Caporelli
- added CGSN_Pioneer-8_IRR_Leg_2_Deck_plan.pdf on May 23, 2017 10:40 AM by Elizabeth A. Caporelli
- added CGSN_Pioneer-8_IRR_Leg_3_Deck_plan.pdf on May 23, 2017 10:40 AM by Elizabeth A. Caporelli
- added CGSN_Pioneer-8_IRR_Leg_1_Deck_plan.pdf on May 23, 2017 10:40 AM by Elizabeth A. Caporelli
- added Pioneer8_timeline_v3.docx on May 22, 2017 2:48 PM by Elizabeth A. Caporelli
- added Pioneer_CTD_HAZMAT_list_with_MSDS.pdf on Mar 14, 2017 3:15 PM by Chad Smith
- added Surface_Buoy_Recovery_Procedure_with_MSDS.pdf on Mar 14, 2017 3:15 PM by Chad Smith
- added Pioneer8_waypoints.xls on Mar 14, 2017 3:15 PM by Chad Smith

Funding

Funding Agency: NSF
Grant or contract number: OOI

Scientific Instrumentation for R/V Armstrong


Science Van 1 Revisions
-added Science Van1 on Mar 14, 2017 3:15 PM by Chad Smith

Science Van 2 Revisions
-added Science Van2 on Mar 14, 2017 3:15 PM by Chad Smith

Science Van 3 Revisions
-added Science Van3 on Mar 14, 2017 3:15 PM by Chad Smith

Science Van 4 Revisions
-added Science Van4 on Mar 14, 2017 3:15 PM by Chad Smith

Shipboard Equipment

Bathymetry System 12 kHz,
ADCP 300 kHz,
ADCP 150 kHz,
A-Frame,
Deionized Water System,
Science Underway Seawater System,
12 kHz Pinger for Wire Use,
Fume Hood,
EK80 Sonar,
Dynamic Positioning System,
Plotters,
USBL Nav,
ADCP 38 kHz,
Crane,
EM710 MkII (40 to 100 kHz) Multibeam Echosounder
-added 12 kHz Pinger for Wire Use on Mar 14, 2017 3:15 PM by Chad Smith
-added A-Frame on Mar 14, 2017 3:15 PM by Chad Smith
-added ADCP 150 kHz on Mar 14, 2017 3:15 PM by Chad Smith
-added ADCP 300 kHz on Mar 14, 2017 3:15 PM by Chad Smith
-added Bathymetry System 12 kHz on Mar 14, 2017 3:15 PM by Chad Smith
-added Crane on Mar 14, 2017 3:15 PM by Chad Smith
-added Dynamic Positioning System on Mar 14, 2017 3:15 PM by Chad Smith
-added Deionized Water System on Mar 14, 2017 3:15 PM by Chad Smith
-added EK80 Sonar on Mar 14, 2017 3:15 PM by Chad Smith
-added EM710 MkII (40 to 100 kHz) Multibeam Echosounder on Mar 14, 2017 3:15 PM by Chad Smith
-added Fume Hood on Mar 14, 2017 3:15 PM by Chad Smith
-added Plotters on Mar 14, 2017 3:15 PM by Chad Smith
-added Science Underway Seawater System on Mar 14, 2017 3:15 PM by Chad Smith
-added ADCP 38 kHz on Mar 14, 2017 3:15 PM by Chad Smith
-added USBL Nav on Mar 14, 2017 3:15 PM by Chad Smith

Shipboard Communication

Basic Internet access via HiSeasNet
-added Basic Internet access via HiSeasNet on Mar 14, 2017 3:15 PM by Chad Smith

CTD/Water Sampling

Wet Labs C*Star transmissometer (660nm wavelength),
SBE43 oxygen sensor,
911+ Rosette 24-position, 10-liter bottle Rosette with dual T/C sensors,
Biospherical underwater PAR (1000m depth limit) with reference Surface PAR,
Wet Labs FLNTURTD Combination Flourometer and Turbidity Sensor
-added 911+ Rosette 24-position, 10-liter bottle Rosette with dual T/C sensors on Mar 14, 2017 3:15 PM by Chad Smith
-added Biospherical underwater PAR (1000m depth limit) with reference Surface PAR on Mar 14, 2017 3:15 PM by Chad Smith
-added SBE43 oxygen sensor on Mar 14, 2017 3:15 PM by Chad Smith
-added Wet Labs C*Star transmissometer (660nm wavelength) on Mar 14, 2017 3:15 PM by Chad Smith
-added Wet Labs FLNTURTD Combination Flourometer and Turbidity Sensor on Mar 14, 2017 3:15 PM by Chad Smith

Critical CTD Sensors

Hydrographic Analysis Equipment

Salinometer ,
Salt Bottles (2 cases of 125 ml provided)
-added Salinometer on Mar 14, 2017 3:15 PM by Chad Smith
-added Salt Bottles (2 cases of 125 ml provided) on Mar 14, 2017 3:15 PM by Chad Smith

MET Sensors

Barometric Pressure,
Air temperature,
Precipitation,
Relative Humidity,
Wind speed and direction,
Short Wave Solar Radiation,
Long Wave Solar Radiation
-added Air temperature on Mar 14, 2017 3:15 PM by Chad Smith
-added Barometric Pressure on Mar 14, 2017 3:15 PM by Chad Smith
-added Precipitation on Mar 14, 2017 3:15 PM by Chad Smith
-added Relative Humidity on Mar 14, 2017 3:15 PM by Chad Smith
-added Short Wave Solar Radiation on Mar 14, 2017 3:15 PM by Chad Smith
-added Wind speed and direction on Mar 14, 2017 3:15 PM by Chad Smith
-added Long Wave Solar Radiation on Mar 14, 2017 3:15 PM by Chad Smith

Sample Storage

Freezer -70°C 3.2 cu. ft. ea.
-added Freezer -70°C 3.2 cu. ft. ea. on Mar 14, 2017 3:15 PM by Chad Smith
Storage Notes: Freezer for chlorophyll and nutrient samples
- added Freezer for chlorophyll and nutrient samples on Mar 14, 2017 3:15 PM by Chad Smith

Navigation

Will you be using Long Base Line (LBL) navigation? no
- added no on Mar 14, 2017 3:15 PM by Chad Smith
How many nets? null
How many tansponders? null
Will you be using Ultra-short baseline (USBL) navigation?no
- added no on Mar 14, 2017 3:15 PM by Chad Smith

Navigation

GPS,
USBL
-added GPS on Mar 14, 2017 3:15 PM by Chad Smith
-added USBL on Mar 14, 2017 3:15 PM by Chad Smith
Navigation Notes: Serial GPS feed for Chief Sci laptop navigation application. USBL comms needed for UConn ROV Kraken II
- added Serial GPS feed for Chief Sci laptop navigation application. USBL comms needed for UConn ROV Kraken II on Mar 14, 2017 3:15 PM by Chad Smith

Winches

Other Portable Winch,
UNOLS Winch Pool
-added Other Portable Winch on Mar 14, 2017 3:15 PM by Chad Smith
-added UNOLS Winch Pool on Mar 14, 2017 3:15 PM by Chad Smith
Winch Notes: Science party has reserved TSE split drum winch from winch pool. Science party will supply Lantec heavy-lift winch.
- added Science party has reserved TSE split drum winch from winch pool. Science party will supply Lantec heavy-lift winch. on Mar 14, 2017 3:15 PM by Chad Smith

Wire use and application

CTD Winch with .322" Electro-mechanical wire,
Trawl Winch with 9/16th trawl wire
-added Trawl Winch with 9/16th trawl wire on Mar 14, 2017 3:15 PM by Chad Smith
-added CTD Winch with .322" Electro-mechanical wire on Mar 14, 2017 3:15 PM by Chad Smith
Winch Notes: Trawl winch is for possible dragging operations.
- added Trawl winch is for possible dragging operations. on Mar 14, 2017 3:15 PM by Chad Smith

Standard Oceanographic Cables

Slip ring required? no
Non-standard wire required? no
Traction winch required? no

Specialized Deck Equipment

Mooring Deployment/Recovery Equipment Required: yes Type: winches, tuggers, cleats
Cruise Specific Science Winch Required: yes Type: TSE, Lantec
Nets Required: no Type: 
Mooring Deployment/Recovery Equipment Revisions

- Mooring Deployment/Recovery Equipment Required? : changed from no to yes on May 22, 2017 2:49 PM by Elizabeth A. Caporelli
- Mooring Deployment/Recovery Equipment Required? : added no on Mar 14, 2017 3:15 PM by Chad Smith
- Type : added winches, tuggers, cleats on Mar 14, 2017 3:15 PM by Chad Smith
Cruise Specific Science Winch Revisions

- Cruise Specific Science Winch Required? : changed from no to yes on May 22, 2017 2:49 PM by Elizabeth A. Caporelli
- Cruise Specific Science Winch Required? : added no on Mar 14, 2017 3:15 PM by Chad Smith
- Type : added TSE, Lantec on Mar 14, 2017 3:15 PM by Chad Smith

Over the Side Equipment

Will you be bringing any equipment (winches, blocks, etc.) that lowers instruments over the side? yes
Details: TSE winch, for mooring deployment and recovery; Lantec winch, for anchor deployment and recovery.
- added TSE winch, for mooring deployment and recovery; Lantec winch, for anchor deployment and recovery. on Mar 14, 2017 3:15 PM by Chad Smith

Special Requirements

Elecrical Power: yes Identify TSE, rigging van: 440V 3 ph, Lantec: 480V 160A
Equipment Handling: no Identify: 
Inter/intraship Communications: no Identify: 
Science Stowage: no Identify: 
Water: no Identify: 
Electrical Power Revisions

- Electrical Power : changed from no to yes on May 22, 2017 2:49 PM by Elizabeth A. Caporelli
- Electrical Power : added no on Mar 14, 2017 3:15 PM by Chad Smith
- Identify : added TSE, rigging van: 440V 3 ph, Lantec: 480V 160A on Mar 14, 2017 3:15 PM by Chad Smith

Additional Cruise Items/Activities

Explosive Devices:no
Portable Air Compressors:no
Flammable Gases:no
Small Boat Operations:yes
SCUBA Diving Operations:no

Hazardous Material

Will hazardous material be utilized?yes
- added yes on Mar 14, 2017 3:15 PM by Chad Smith
Describe deployment method and quantity:
HAZMAT info will be attached in a separate document.
- added HAZMAT info will be attached in a separate document. on Mar 14, 2017 3:15 PM by Chad Smith

Radioactive Material

Radioiosotopes:no

Additional Information

Is night time work anticipated on this cruise?yes
- added yes on Mar 14, 2017 3:15 PM by Chad Smith
Specialized tech support (Seabeam, coring, other):
SSSG will be able to handle most activities. Occasional need for Bos'n and deck help (crane) for short periods, e.g. a glider deployment or recovery.
- added SSSG will be able to handle most activities. Occasional need for Bos'n and deck help (crane) for short periods, e.g. a glider deployment or recovery. on Mar 14, 2017 3:15 PM by Chad Smith
Other required equipment and special needs:
AUV handling equipment (SOO-LARS) will need to be installed on starboard aft arm between Leg A and B.
- added AUV handling equipment (SOO-LARS) will need to be installed on starboard aft arm between Leg A and B. on Mar 14, 2017 3:15 PM by Chad Smith

Checklist & Notes

Checklist

U.S. Customs Form: no
- added no on Mar 30, 2017 11:40 AM by Eric Benway
Diplomatic Clearance: no
- added no on Mar 30, 2017 11:40 AM by Eric Benway
Date Submitted:
Date Approved:
Agent Information:
WHOI rep.
- added WHOI rep. on May 22, 2017 2:51 PM by Elizabeth A. Caporelli
Countries:
n/a
- added n/a on May 22, 2017 2:51 PM by Elizabeth A. Caporelli
Notes:
n/a
- added n/a on May 22, 2017 2:51 PM by Elizabeth A. Caporelli
Isotope Use Approval: no
- added no on Mar 30, 2017 11:40 AM by Eric Benway
Isotope Notes:
n/a
- added n/a on May 22, 2017 2:51 PM by Elizabeth A. Caporelli
SCUBA Diving: no
- added no on Mar 30, 2017 11:40 AM by Eric Benway

Checklist

SSSG Tech:
UPDATED MAY 22:

May 25 - May 29:
OOI will need to mobilize Leg A on May 28 Sunday and May 29 Monday - Memorial Day Weekend.   Dock will be staged the Thurs and Fri before the long weekend.  Only support equipment needed on Sun & Mon is large forklift to move containers near Armstrong.  Amrstrong crane can load all containers and ROV. 

ROV to arrive Saturday a.m.

NO Shore crane required during Mml day mobe.

May 31 & June 1:
Leg B staging to begin. 
2 Proflier Moorings
2 large surface moorings
AUV & 3 Gliders
Will need WHOI crane (Tony) for staging surface moorings on pier.

June 3:
Armstrong docks port side to dock for SOO-LARS testing June 4
Off load Leg A (UCONN ROV van, winch and anchors).
reset deck. 

June 4:
Load Leg B.  2 Surface Moorings, anchors, 2 Proflier moorings, SOO LARS Test etc,.

June 5:
Ship departs
Clear dock of OOI equip (6/5 - 6/7).

June 9:
Stage dock for Leg C
Bring down 3 proflier moorings

June 9:
Bring down Large surface mooring
OOI will need WHOI crane (Tony) for staging surface moorings on pier.


June 12:
Armstrong arrives
Off load Leg B (2 Surf. moorings, 2 proflier moorings, AUV, SOO-LARS, anchors.

June 13:
Load Leg C
3 Proflier moorings, anchors
1 Surface Mooring, anchor

June 14: 
Ship departs Leg C.
Start cleaning off dock.

June 20:
Armstrong arrives.
Off load Leg C. 
bring gear up to LOSOS June 20 & 21.
OOI will need WHOI crane (Tony) to load Surface moorings on flatbed.





- changed from UPDATED MAY 22:

May 25 - May 29:
OOI will need to mobilize Leg A on May 28 Sunday and May 29 Monday - Memorial Day Weekend.   Dock will be staged the Thurs and Fri before the long weekend.  Only support equipment needed on Sun & Mon is large forklift to move containers near Armstrong.  Amrstrong crane can load all containers and ROV. 

ROV to arrive Saturday a.m.

NO Shore crane required during Mml day mobe.

May 31 & June 1:
Leg B staging to begin. 
2 Proflier Moorings
2 large surface moorings
AUV & 3 Gliders
Will need WHOI crane (Tony) for staging surface moorings on pier.

June 3:
Armstrong docks port side to dock for SOO-LARS testing June 4
Off load Leg A (UCONN ROV van, winch and anchors).
reset deck. 

June 4:
Load Leg B.  2 Surface Moorings, anchors, 2 Proflier moorings, SOO LARS Test etc,.

June 5:
Ship departs
Clear dock of OOI equip (6/5 - 6/7).

June 9:
Stage dock for Leg C
Bring down 3 proflier moorings

June 9:
Bring down Large surface mooring
OOI will need WHOI crane (Tony) for staging surface moorings on pier.


June 12:
Armstrong arrives
Off load Leg B (2 Surf. moorings, 2 proflier moorings, AUV, SOO-LARS, anchors.

June 13:
Load Leg C
3 Proflier moorings, anchors
1 Surface Mooring, anchor

June 14: 
Ship departs Leg C.
Start cleaning off dock.

June 20:
Armstrong arrives.
Off load Leg C. 
bring gear up to LOSOS June 20 & 21.
OOI will need WHOI crane (Tony) to load Surface moorings on flatbed.





to OOI will need to mobilize Leg 1 on May 28 Sunday and May 29 Monday - Memorial Day Weekend.   Dock will be staged the Thurs and Fri before the long weekend.  Only support equipment needed on Sun & Mon is large forklift to move containers near Armstrong.  Amrstrong crane can load all containers and ROV. 
NO Shore crane required.

Leg 2 will be staged June 1 & June 2.  The three large Surface buoys will be brought down and off loaded by Baxter Crane.  

Off load Leg 1 will be by ships crane on June 3 w/ ROV container only. 
Loading Leg 2 will be June 4 by ships crane and forklift on dock.

Off Load Leg 2 will be on June 12th with ships crane and large forklift on dock.
Loading Leg 3 will be on June 12 & 13th (before departure) with 6 small profling buoys and subsurface balls.
on Apr 6, 2017 1:18 PM by Eric Benway
- changed from OOI will need to mobilize Leg 1 on May 28 Sunday and May 29 Monday - Memorial Day Weekend.   Dock will be staged the Thurs and Fri before the long weekend.  Only support equipment needed on Sun & Mon is large forklift to move containers near Armstrong.  Amrstrong crane can load all containers and ROV. 
May 31 WHOI Shore crane required.

Leg 2 will be staged June 1 & June 2.  The three large Surface buoys will be brought down and off loaded by Baxter Crane.  

Off load Leg 1 will be by ships crane on June 3 w/ ROV container only. 
Loading Leg 2 will be June 4 by ships crane and forklift on dock.

Off Load Leg 2 will be on June 12th with ships crane and large forklift on dock.
Loading Leg 3 will be on June 12 & 13th (before departure) with 6 small profling buoys and subsurface balls.
to UPDATED MAY 22:

May 25 - May 29:
OOI will need to mobilize Leg A on May 28 Sunday and May 29 Monday - Memorial Day Weekend.   Dock will be staged the Thurs and Fri before the long weekend.  Only support equipment needed on Sun & Mon is large forklift to move containers near Armstrong.  Amrstrong crane can load all containers and ROV. 

ROV to arrive Saturday a.m.

NO Shore crane required during Mml day mobe.

May 31 & June 1:
Leg B staging to begin. 
2 Proflier Moorings
2 large surface moorings
AUV & 3 Gliders
Will need WHOI crane (Tony) for staging surface moorings on pier.

June 3:
Armstrong docks port side to dock for SOO-LARS testing June 4
Off load Leg A (UCONN ROV van, winch and anchors).
reset deck. 

June 4:
Load Leg B.  2 Surface Moorings, anchors, 2 Proflier moorings, SOO LARS Test etc,.

June 5:
Ship departs
Clear dock of OOI equip (6/5 - 6/7).

June 9:
Stage dock for Leg C
Bring down 3 proflier moorings

June 9:
Bring down Large surface mooring
OOI will need WHOI crane (Tony) for staging surface moorings on pier.


June 12:
Armstrong arrives
Off load Leg B (2 Surf. moorings, 2 proflier moorings, AUV, SOO-LARS, anchors.

June 13:
Load Leg C
3 Proflier moorings, anchors
1 Surface Mooring, anchor

June 14: 
Ship departs Leg C.
Start cleaning off dock.

June 20:
Armstrong arrives.
Off load Leg C. 
bring gear up to LOSOS June 20 & 21.
OOI will need WHOI crane (Tony) to load Surface moorings on flatbed.





on May 22, 2017 3:07 PM by Eric Benway
- changed from OOI will need to mobilize Leg 1 on May 28 Sunday and May 29 Monday - Memorial Day Weekend.   Dock will be staged the Thurs and Fri before the long weekend.  Only support equipment needed on Sun & Mon is large forklift to move containers near Armstrong.  Amrstrong crane can load all containers and ROV. 
NO Shore crane required.

Leg 2 will be staged June 1 & June 2.  The three large Surface buoys will be brought down and off loaded by Baxter Crane.  

Off load Leg 1 will be by ships crane on June 3 w/ ROV container only. 
Loading Leg 2 will be June 4 by ships crane and forklift on dock.

Off Load Leg 2 will be on June 12th with ships crane and large forklift on dock.
Loading Leg 3 will be on June 12 & 13th (before departure) with 6 small profling buoys and subsurface balls.
to OOI will need to mobilize Leg 1 on May 28 Sunday and May 29 Monday - Memorial Day Weekend.   Dock will be staged the Thurs and Fri before the long weekend.  Only support equipment needed on Sun & Mon is large forklift to move containers near Armstrong.  Amrstrong crane can load all containers and ROV. 
May 31 WHOI Shore crane required.

Leg 2 will be staged June 1 & June 2.  The three large Surface buoys will be brought down and off loaded by Baxter Crane.  

Off load Leg 1 will be by ships crane on June 3 w/ ROV container only. 
Loading Leg 2 will be June 4 by ships crane and forklift on dock.

Off Load Leg 2 will be on June 12th with ships crane and large forklift on dock.
Loading Leg 3 will be on June 12 & 13th (before departure) with 6 small profling buoys and subsurface balls.
on May 22, 2017 2:51 PM by Elizabeth A. Caporelli
- changed from OOI will need to mobilize Leg 1 on May 28 Sunday and May 29 Monday - Memorial Day Weekend.   Dock will be staged the Thurs and Fri before the long weekend.  Only support equipment needed on Sun & Mon is large forklift to move containers near Armstrong.  Amrstrong crane can load all containers and ROV. 
NO Shore crane required.

Leg 2 will be staged June 1 & June 2.  The three large Surface buoys will be brought down and off loaded by Baxter Crane.  

Off load Leg 1 will be by ships crane on June 3 w/ ROV container only. 
Loading Leg 2 will be June 4 by ships crane and forklift on dock.

Off Load Leg 2 will be on June 12th with ships crane and large forklift on dock.
Loading Leg 3 will be on June 12 & 13th (before departure) with 6 small profling buoys and subsurface balls.  
to OOI will need to mobilize Leg 1 on May 28 Sunday and May 29 Monday - Memorial Day Weekend.   Dock will be staged the Thurs and Fri before the long weekend.  Only support equipment needed on Sun & Mon is large forklift to move containers near Armstrong.  Amrstrong crane can load all containers and ROV. 
NO Shore crane required.

Leg 2 will be staged June 1 & June 2.  The three large Surface buoys will be brought down and off loaded by Baxter Crane.  

Off load Leg 1 will be by ships crane on June 3 w/ ROV container only. 
Loading Leg 2 will be June 4 by ships crane and forklift on dock.

Off Load Leg 2 will be on June 12th with ships crane and large forklift on dock.
Loading Leg 3 will be on June 12 & 13th (before departure) with 6 small profling buoys and subsurface balls.
on Mar 30, 2017 11:40 AM by Eric Benway
- added OOI will need to mobilize Leg 1 on May 28 Sunday and May 29 Monday - Memorial Day Weekend.   Dock will be staged the Thurs and Fri before the long weekend.  Only support equipment needed on Sun & Mon is large forklift to move containers near Armstrong.  Amrstrong crane can load all containers and ROV. 
NO Shore crane required.

Leg 2 will be staged June 1 & June 2.  The three large Surface buoys will be brought down and off loaded by Baxter Crane.  

Off load Leg 1 will be by ships crane on June 3 w/ ROV container only. 
Loading Leg 2 will be June 4 by ships crane and forklift on dock.

Off Load Leg 2 will be on June 12th with ships crane and large forklift on dock.
Loading Leg 3 will be on June 12 & 13th (before departure) with 6 small profling buoys and subsurface balls.  
on Mar 30, 2017 11:40 AM by Eric Benway
This year we will use a new SooLars off of the ships aft starboard handling device.   Testing date for the SooLars will be MAY 1st.  HPU unit is ~ 525 lbs and is 3'x3'.  Will need to run hyd. lines up and out onto the docking head of the arm.  

Plan to test unit w/ AUV on June 4 on the ship in the harbor while tied up.
- changed from This year we will use a new SooLars off of the ships aft starboard handling device.   Testing date for the SooLars will be MAY 1st.  HPU unit is ~ 525 lbs and is 3'x3'.  Will need to run hyd. lines up and out onto the docking head of the arm.  

Plan to test unit w/ AUV on June 4 on the ship in the harbor while tied up.
to Leg 2 June 5 - June 12 will be to deploy and recover the three large surface moorings.  Also on this cruise will be AUV operations. 

This year we will use a new SooLars off of the ships aft starboard handling device.   Testing date for the SooLars will be MAY 1st.  HPU unit is ~ 525 lbs and is 3'x3'.  Will need to run hyd. lines up and out onto the docking head of the arm.  

Plan to test unit w/ AUV on May 1.  Also plan to wet test on the way out in Tarpaulin Cove during leg 2 departure.
on Apr 6, 2017 1:18 PM by Eric Benway
- changed from This year we will use a new SooLars off of the ships aft starboard handling device.   Testing date for the SooLars will be MAY 1st.  HPU unit is ~ 525 lbs and is 3'x3'.  Will need to run hyd. lines up and out onto the docking head of the arm.  

Plan to test unit w/ AUV on June 4 on the ship in the harbor while tied up.  
to This year we will use a new SooLars off of the ships aft starboard handling device.   Testing date for the SooLars will be MAY 1st.  HPU unit is ~ 525 lbs and is 3'x3'.  Will need to run hyd. lines up and out onto the docking head of the arm.  

Plan to test unit w/ AUV on June 4 on the ship in the harbor while tied up.
on May 22, 2017 3:07 PM by Eric Benway
- changed from Leg 2 June 5 - June 12 will be to deploy and recover the three large surface moorings.  Also on this cruise will be AUV operations. 

This year we will use a new SooLars off of the ships aft starboard handling device.   Testing date for the SooLars will be MAY 1st.  HPU unit is ~ 525 lbs and is 3'x3'.  Will need to run hyd. lines up and out onto the docking head of the arm.  

Plan to test unit w/ AUV on May 1.  Also plan to wet test on the way out in Tarpaulin Cove during leg 2 departure.
to This year we will use a new SooLars off of the ships aft starboard handling device.   Testing date for the SooLars will be MAY 1st.  HPU unit is ~ 525 lbs and is 3'x3'.  Will need to run hyd. lines up and out onto the docking head of the arm.  

Plan to test unit w/ AUV on June 4 on the ship in the harbor while tied up.  
on May 22, 2017 3:07 PM by Eric Benway
- changed from Leg 2 June 5 - June 12 will be to deploy and recover the three large surface moorings.  Also on this cruise will be AUV operations. 

This year we will use a new SooLars off of the ships aft starboard handling device.   Testing date for the SooLars will be MAY 1st.  HPU unit is ~ 525 lbs and is 3'x3'.  Will need to run hyd. lines up and out onto the docking head of the arm.  

Plan to test unit w/ AUV on May 1.  Also plan to wet test on the way out in Tarpaulin Cove during leg 2 departure. 
to Leg 2 June 5 - June 12 will be to deploy and recover the three large surface moorings.  Also on this cruise will be AUV operations. 

This year we will use a new SooLars off of the ships aft starboard handling device.   Testing date for the SooLars will be MAY 1st.  HPU unit is ~ 525 lbs and is 3'x3'.  Will need to run hyd. lines up and out onto the docking head of the arm.  

Plan to test unit w/ AUV on May 1.  Also plan to wet test on the way out in Tarpaulin Cove during leg 2 departure.
on Mar 30, 2017 11:40 AM by Eric Benway
- added Leg 2 June 5 - June 12 will be to deploy and recover the three large surface moorings.  Also on this cruise will be AUV operations. 

This year we will use a new SooLars off of the ships aft starboard handling device.   Testing date for the SooLars will be MAY 1st.  HPU unit is ~ 525 lbs and is 3'x3'.  Will need to run hyd. lines up and out onto the docking head of the arm.  

Plan to test unit w/ AUV on May 1.  Also plan to wet test on the way out in Tarpaulin Cove during leg 2 departure. 
on Mar 30, 2017 11:40 AM by Eric Benway