Woods Hole Oceanographic Institution
Cruise Planning Synopsis
Ship | |
R/V Atlantis | |
Cruise Party | |
Jennifer Johnson: Chief Scientist null +1 508 289 2382 jjjohnson@whoi.edu Andone Lavery: Principal Investigator Woods Hole Oceanographic Institution Bigelow 211, MS#11 Woods Hole, Ma. USA 02543 +1 508 289 2345 alavery@whoi.edu | |
- added Jennifer Johnson as Chief Scientist on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |
- added Andone Lavery as Principal Investigator on Jun 16, 2021 5:52 PM by Christopher T. Lewis |
Departure: Jul 12, 2021 | |
Anacortes, WA | |
Arrival: Jul 19, 2021 | |
San Francisco, CA | |
Operations Area | |
Swiftsure Bank and Barkley Canyon | |
- Swiftsure Bank and Barkley Canyon on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |
Lat/Lon: 48° 4.0′ N / 126° 25.0′ W | |
- set lat to 48° 4.0′ N, set lon to 126° 25.0′ W on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |
Depth Range: 100 / 2400 | |
- set min to 100, set max to 2400 on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |
Will the vessel be operating within 200 NM of a foreign country? | no |
Science Objectives | |
The primary goals of this project are: 1. Sea Acceptance Tests (SATs) of newly installed EK80 and EM124 sonar systems. 2. Conduct noise and interference testing for newly installed sonars with currently installed scientific instrumentation. 3. Synchronization of survey specific instruments with Ksync device. | |
- The primary goals of this project are: 1. Sea Acceptance Tests (SATs) of newly installed EK80 and EM124 sonar systems. 2. Conduct noise and interference testing for newly installed sonars with currently installed scientific instrumentation. 3. Synchronization of survey specific instruments with Ksync device. on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |
Science Activities | |
Science activities include: 1. EM124 Patch Test that will consist of two full runs. 2. EK80 and EM124 noise evaluations at different vessel speeds, from drifting to 12 knots. 3. EM80 and EM124 interference testing with currently installed scientific instrumentation, such as ADCP and Knudsen, along with bridge navigation instrumention such as speed logger and fathometer. 4. Collect EK80 data at biologically rich area on the shelf or shelf break, less than 500m. 5. Collect EM124 data at deep water site, approximately 1000m. | |
- Science activities include: 1. EM124 Patch Test that will consist of two full runs. 2. EK80 and EM124 noise evaluations at different vessel speeds, from drifting to 12 knots. 3. EM80 and EM124 interference testing with currently installed scientific instrumentation, such as ADCP and Knudsen, along with bridge navigation instrumention such as speed logger and fathometer. 4. Collect EK80 data at biologically rich area on the shelf or shelf break, less than 500m. 5. Collect EM124 data at deep water site, approximately 1000m. on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |
Additional Info | |
Pre-cruise Planning Meeting: Teleconference | |
- Teleconference on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |
- on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |
Stations: | |
Supporting documentation: |
Funding |
Funding Agency: NSF | |
Grant or contract number: 82267004 |
Scientific Instrumentation for R/V Atlantis |
Shipboard Equipment | |||||||||||
Bathymetry System 12 kHz, | |||||||||||
Sippican XBT System (Mark 21), | |||||||||||
Bathymetry System 3.5 kHz , | |||||||||||
ADCP 75 kHz, | |||||||||||
Multibeam , | |||||||||||
Transducer well for visiting instrumentation, | |||||||||||
Navigation - Position | |||||||||||
-added ADCP 75 kHz on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |||||||||||
-added Bathymetry System 12 kHz on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |||||||||||
-added Bathymetry System 3.5 kHz on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |||||||||||
-added Multibeam on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |||||||||||
-added Navigation - Position on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |||||||||||
-added Sippican XBT System (Mark 21) on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |||||||||||
-added Transducer well for visiting instrumentation on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |||||||||||
Shipboard Communication | |||||||||||
Basic Internet access via HiSeasNet, | |||||||||||
Is there a need to receive data from shore on a regular basis?, | |||||||||||
Is there a need to transfer data to shore on a regular basis?, | |||||||||||
Is there an expectation to use Skype or any other real-time video conference program? | |||||||||||
-added Basic Internet access via HiSeasNet on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |||||||||||
-added Is there a need to receive data from shore on a regular basis? on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |||||||||||
-added Is there a need to transfer data to shore on a regular basis? on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |||||||||||
-added Is there an expectation to use Skype or any other real-time video conference program? on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |||||||||||
Critical CTD Sensors | |||||||||||
Storage Notes: | |||||||||||
Navigation | |||||||||||
Will you be using Long Base Line (LBL) navigation? | no | ||||||||||
- added no on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |||||||||||
How many nets? | null | ||||||||||
How many tansponders? | null | ||||||||||
Will you be using Ultra-short baseline (USBL) navigation? | no | ||||||||||
- added no on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |||||||||||
Navigation | |||||||||||
GPS, | |||||||||||
USBL | |||||||||||
-added GPS on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |||||||||||
-added USBL on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |||||||||||
Navigation Notes: USBL will be used to test new Sonardyn head | |||||||||||
- added USBL will be used to test new Sonardyn head on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |||||||||||
Winches | |||||||||||
CTD Winch with .322" Electro-mechanical wire | |||||||||||
-added CTD Winch with .322" Electro-mechanical wire on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |||||||||||
Winch Notes: For deploying beacon to test USBL head | |||||||||||
- added For deploying beacon to test USBL head on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |||||||||||
Winch Notes: | |||||||||||
Standard Oceanographic Cables | |||||||||||
| |||||||||||
Specialized Deck Equipment | |||||||||||
| |||||||||||
Over the Side Equipment | |||||||||||
Will you be bringing any equipment (winches, blocks, etc.) that lowers instruments over the side? | no | ||||||||||
Special Requirements | |||||||||||
| |||||||||||
Additional Cruise Items/Activities | |||||||||||
Explosive Devices: | no | ||||||||||
Portable Air Compressors: | no | ||||||||||
Flammable Gases: | no | ||||||||||
Small Boat Operations: | no | ||||||||||
SCUBA Diving Operations: | no | ||||||||||
Hazardous Material | |||||||||||
Will hazardous material be utilized? | no | ||||||||||
- added no on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |||||||||||
Describe deployment method and quantity: | |||||||||||
Radioactive Material | |||||||||||
Radioiosotopes: | no | ||||||||||
Additional Information | |||||||||||
Is night time work anticipated on this cruise? | yes | ||||||||||
- added yes on Jun 16, 2021 5:52 PM by Christopher T. Lewis | |||||||||||
Specialized tech support (Seabeam, coring, other): | |||||||||||
Other required equipment and special needs: |
Checklist & Notes |
Checklist | |
U.S. Customs Form: | no |
Diplomatic Clearance: | no |
Date Submitted: | |
Date Approved: | |
Agent Information: | |
Countries: | |
Notes: | |
Isotope Use Approval: | no |
Isotope Notes: | |
SCUBA Diving: | no |
Checklist | |
SSSG Tech: | |